Friday, April 9, 2010

The New Embassy in Valletta

The New Embassy Compound in Valletta Addresses Stormwater Run-Off:
1. Erosion and Sediment control during construction including sediment traps, basins and silt fencing.
2. An underground stormwater retention tank will be permanently installed to retain 95% of stormwater runoff from the site so that it can be reused for the landscaping.

0 comments:

Post a Comment

Note: Only a member of this blog may post a comment.