The New Embassy Compound in Valletta Addresses Stormwater Run-Off:
1. Erosion and Sediment control during construction including sediment traps, basins and silt fencing.
2. An underground stormwater retention tank will be permanently installed to retain 95% of stormwater runoff from the site so that it can be reused for the landscaping.
Friday, April 9, 2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment
Note: Only a member of this blog may post a comment.